Lionheart Concerto - Bob Perry

Ken Sawyer has worked with us now for several years. The initial projects were large refits: first a Tashiba 40 and then one of our Seguin 46's. The success of both projects led us to build FAIRWEATHER, the first in our latest Seguin Series. Along the way, we also worked on Ken's houses to develop and illustrate his Yarchitecture designs. Yarchitecture is Ken's term for his design philosophies he is incorporating into his home. We built his concepts into his houses (both on Kiawah Island, South Carolina and in Cushing, Maine), so he can showcase and sell his yarchitecture to others. This newest project -- LIONHEART CONCERTO - brings another member to the team: a Yamaha Piano. Featured in this beautiful Bob Perry designed 42 is a full-sounding Yamaha piano which will be tied into the boat's sound system for the total music package. How many boats of 42' feature a Yamaha piano? The hull is extremely efficient and is powered using only a single 225hp conventional drive system. 

  • Salon of Lionheart Concerto.   © 2012 Billy Black
    Salon of Lionheart Concerto.   © 2012 Billy Black
  • Aerial view of Lionheart Concerto built by Lyman-Morse Boatbuilding of Thomaston, Maine.    © 2011 Billy Black
    Aerial view of Lionheart Concerto built by Lyman-Morse Boatbuilding of Thomaston, Maine.   © 2011 Billy Black
  • Custom build settee.  Cushions also created by Lyman-Morse.   © 2012 Billy Black
    Custom build settee. Cushions also created by Lyman-Morse.   © 2012 Billy Black
  • V-berth of Lyman-Morse Boatbuilding/Robert Perry's Lionheart's Concerto of Thomaston, Maine.   © 2012 Billy Black
    V-berth of Lyman-Morse Boatbuilding/Robert Perry's Lionheart's Concerto of Thomaston, Maine.   © 2012 Billy Black
  • Brushed stainless helm station of Lionheart Concerto built by Lyman-Morse Boatbuilding.   © 2012 Billy Black
    Brushed stainless helm station of Lionheart Concerto built by Lyman-Morse Boatbuilding.   © 2012 Billy Black
  • Helm of Lionheart Concerto.   © 2012 Billy Black
    Helm of Lionheart Concerto.   © 2012 Billy Black
  • Wood inlay pattern meticulously created by the craftsmen at Lyman-Morse.   © 2012 Billy Black
    Wood inlay pattern meticulously created by the craftsmen at Lyman-Morse.   © 2012 Billy Black
  • Carved lion created by Lyman-Morse Boatbuilding   © 2012 Billy Black
    Carved lion created by Lyman-Morse Boatbuilding   © 2012 Billy Black
  • Lionheart Concerto cabin looking forward by Lyman-Morse Boatbuilding in Thomaston, Maine   © 2012 Billy Black
    Lionheart Concerto cabin looking forward by Lyman-Morse Boatbuilding in Thomaston, Maine   © 2012 Billy Black
  • Unique and intricate folding table created by Lyman-Morse.   © 2012 Billy Black
    Unique and intricate folding table created by Lyman-Morse.   © 2012 Billy Black
  • Yamaha piano with custom wood detail by Lyman-Morse Boatbuilding   © 2012 Billy Black
    Yamaha piano with custom wood detail by Lyman-Morse Boatbuilding   © 2012 Billy Black
  • Salon of Lionheart Concerto   © 2012 Billy Black
    Salon of Lionheart Concerto   © 2012 Billy Black
  • View from stern, Lionheart Concerto by Lyman-Morse Boatbuilding.   © 2012 Billy Black
    View from stern, Lionheart Concerto by Lyman-Morse Boatbuilding.   © 2012 Billy Black
  • 11/24/2008   
     
  • 11/24/2008   
     
  • 11/24/2008   
     
  • 12/02/2008   
     
  • 12/02/2008   
     
  • Lionheart Concerto running, close up.   © 2012 Billy Black
    Lionheart Concerto running, close up.   © 2012 Billy Black
  • 12/10/2008   
     
  • 12/28/2008 The hull  mold arrives  
    The hull mold arrives  
  • 02/04/2008 Fitting and leveling the hull mold  
    Fitting and leveling the hull mold  
  • 04/22/2008 Fitting the core  
    Fitting the core  
  • 05/06/2008 Fitting vacuum bag in preparation for infusion  
    Fitting vacuum bag in preparation for infusion  
  • 05/12/2008 Infusing the hull...  
    Infusing the hull...  
  • 05/05/2008 Pulling the bag and feed lines  
    Pulling the bag and feed lines  
  • 07/14/2008 Laminating the hull structure  
    Laminating the hull structure  
  • 05/12/2008 Building the deck mold  
    Building the deck mold  
  • 08/11/2008   
     
  • 07/23/2008 Pulling the hull  
    Pulling the hull  
  • 07/23/2008 The hull is pulled free of the mold  
    The hull is pulled free of the mold  
  • 09/15/2008 Pulling the deck out of the fiberglass shop  
    Pulling the deck out of the fiberglass shop  
  • 10/27/2008 Laying out the sole framing for pilothouse  
    Laying out the sole framing for pilothouse  
  • 11/24/2008 Applying gelcoat to inside hull and bilge  
    Applying gelcoat to inside hull and bilge  
  • 12/01/2008 Installing the bow thruster  
    Installing the bow thruster  
  • 12/15/2008 Installing framing for engine room insulation on pilothouse sole  
    Installing framing for engine room insulation on pilothouse sole  
  • 01/12/2009 Laying out mechanicals in engine room.  
    Laying out mechanicals in engine room.  
  • 01/12/2009 Plumbing Freshwater pump in machinery space  
    Plumbing Freshwater pump in machinery space  
  • 02/03/2009 Fitting and installing joinery partitions  
    Fitting and installing joinery partitions  
  • 03/02/2009 Pilothouse sole has been fit and laminated in.  
    Pilothouse sole has been fit and laminated in.  
  • 04/13/2009 Installing interior walnut surrounds.  
    Installing interior walnut surrounds.  
  • 04/15/2009 Lifting the deck onto the hull.  
    Lifting the deck onto the hull.  
  • 05/04/2009 Tapping hull to deck joint.  
    Tapping hull to deck joint.  
  • 05/12/2009 Fairing hull to deck joint.  
    Fairing hull to deck joint.  
  • 05/18/2009 Fairing interior bulkheads.  
    Fairing interior bulkheads.  
  • 06/08/2009 Adding details to passageway bulkhead.  
    Adding details to passageway bulkhead.  
  • 06/15/2009 Laminating toerail.  
    Laminating toerail.  
  • 06/29/2009 Shaping toerail.  
    Shaping toerail.  
  • 08/17/2009 Installing cleats for the pilothouse window treatment.  
    Installing cleats for the pilothouse window treatment.  
  • 08/31/2009 Installing fwd panel in owner's stateroom.  
    Installing fwd panel in owner's stateroom.  
  • 08/31/2009 Vacuum bagging burled veneer on fwd edge of cabin house.  
    Vacuum bagging burled veneer on fwd edge of cabin house.  
  • 09/08/2009 Fairing the hull.  
    Fairing the hull.  
  • 09/21/2009 Installing Window treatment in pilothouse.  
    Installing Window treatment in pilothouse.  
  • 10/19/2009 The hull was painted over the weekend.  
    The hull was painted over the weekend.  
  • 11/02/2009 The deck was painted over the weekend.  
    The deck was painted over the weekend.  
  • 11/09/2009 Installing the pilothouse windows.  
    Installing the pilothouse windows.  
  • 11/16/2009 Installing stainless steel hand rail on cabin house.  
    Installing stainless steel hand rail on cabin house.  
  • 11/30/2009 Fitting trim ring for cabin house windows.  
    Fitting trim ring for cabin house windows.  
  • 12/07/2009 Joinery details on pilothouse helm seat.  
    Joinery details on pilothouse helm seat.  
  • 12/14/2009 Fitting carbon fiber helm pod.  
    Fitting carbon fiber helm pod.  
  • 01/04/2010 Fitting upper cabinet doors in main salon.  
    Fitting upper cabinet doors in main salon.  

Recently Launched

Monhegan 42 -C. Raymond Hunt Design

Monhegan 42 -C. Raymond Hunt Design

SpeedDream/Vlad Murnikov

SpeedDream/Vlad Murnikov

Kiwi Spirit/Farr Yacht Design/Paris 63

Kiwi Spirit/Farr Yacht Design/Paris 63
Back to Top
Join our Mailing List
YBAA Association of Yacht Sales Professionals