Laying out frames for plug construction.
-
Frames are set and ready for strapping and sheathing.
-
Fastening strapping to the frames.
-
Installing the first layer of sheathing.
-
Templates used to help define shape of the stem.
-
Fairing the Plug.
-
Fairing the keel sump.
-
Longboarding the plug after primer application.
-
Plug has been sprayed with gel.
-
Laminating first layer of hull mold.
-
Laminating second layer and core on hull mold.
-
Hull mold laminate is complete. Taping on structural frames.
-
Pulling the plug out of building #8.
-
Lifting the hull mold off of the plug.
-
The mold is free from the plug. Pulling the plug from underneath the mold.
-
Flipping the Hull mold.
-
Hull mold is ready to move back into building #8.
-
Building stagging inside mold.
-
Deck mold construction.
-
Fairing battens on deck mold.
-
Prepping hand laid structural glass before the dry glass is laid in preparation for the infusion.
-
Fitting core in the hull mold.
-
Loading the hull mold with the inner skin.
-
Sheathing the deck mold.
-
Fairing the deck mold.
-
Adding flats in the deck mold for the pilothouse hatches.
-
The hull has been infused.
-
Fairing the deck mold surface.
-
Laying out and fitting hull longitudinals.
-
Laminating the locker lids on the deck mold.
-
Building guest cabin joinery.
-
Fitting and laminating floors in hull.
-
Laminating the topside longitudinal.
-
Pulling the hull from the mold.
-
Laminating the pilothouse mullions.
-
The hull was moved down to building #11.
-
Pulling and flipping the deck.
-
Lifting the deck into position to be fit to the hull.
-
Installing perimeter flange for sole and sole framing for sole.
-
Fairing pilothouse mullions.
-
Fitting fwd crew quarters bulkhead.